Kinne Brook Restoration Project

Goals 

TU is working to restore the lower portion of Kinne Brook, a tributary to the Middle Branch of the Westfield River in western Massachusetts.  By removing a small run-of-the-river dam on private property, over 10 miles of up- and downstream access for angler will be returned to this tributary. Eastern brook trout presently exist across a wide range of the Westfield River’s Middle Branch; however, recent electrofishing survey results show declining native fish populations on Kinne Brook tributaries. Our approach is to remove any barriers to fish movement and allow the stream to return to its natural flow. We expect that this will result in a number of miles of increased access to the stream.

 

Tactics 

We have spent the last two years prioritizing how to dramatically improve conditions in the Westfield River watershed. With over 10 miles of Kinne Brook’s interconnected streams flowing into the Middle Branch, this dam removal will reconnect ideal spawning and rearing habitat for eastern brook trout, Atlantic salmon, American eel, sea lamprey and slimy sculpin.

The plan is to remove the 30-foot long, six-foot high dam to reopen the majority of the main stem of Kinne Brook to its natural stream channel. Once the dam is removed,we will work to remove invasive species and will plant native species, stabilize the stream banks and will rebuild the stream channel. All will improve fishing conditions on the Kinne Brook.

 

Victories 

The area surrounding the Kinne Brook is well preserved--over 60 percent of the land area is conserved. This long-term protection was a key element  for us as we decided to work in the Kinne Brook watershed.

Collaborating with the environmental science department of Westfield State University, a two-year study showed that the insect populations within Kinne Brook are diverse, healthy and productive. This is encouraging as declining fish populations should rebound quickly once stream connectivity is restored. We expect to complete the project in 2013.

 

 

Staff Contact 

Colin Lawson

New England Culvert Project Coordinator

603-228-2200

clawson@tu.org

Issues 
Dams
Invasive Species
Places 
Kinne Brook
Massachusetts
Westfield River
Chester
Littleville Reservoir
Species 

Brook Trout

Brook Trout

Atlantic Salmon

Atlantic Salmon

Solutions 
Reconnect
Restore
Author of this Page 

Colin Lawson

Risks to Fishing 
x

Add Content